13mm Wide x 90cm long Leads Multiple Colours
This lead is perfect for the smaller dog. Its lightweight but very strong, water will not damage the lead and dries in seconds. Handmade in from Genuine Biothane (USA) with the look and feel of Leather.
Look for your matching 13mm wide collar here or if you prefer a wider collar you will find them here
13mm wide x 1.6 meters long
Available in solid brass or s tainless steel hardware (stainless steel is recommended if your dog swims in the sea)
Biothane is incredibly strong, looks fantastic and offers great benefits, such as :
- The look and feel of leather (Beta Coating).
- Maintenance Free, unlike leather.
- Easily cleans up in warm soapy water.
- Odour Resistant.
- Waterproof, so will not rot.
- Easily cut to length and will not fray
- Available in a great selection of colours and sizes.
- Colour will not fade or run
Note: Biothane is very strong in terms of pulling weight and will last longer than nylon or uncoated webbing leads but if your dog is left alone with it and chews it, they can chew through it like any lead so we do not recommend leaving it in a position where the dog can chew it
Lead comes standard with O ring in handle to clip on your dog clean up bag and/or attach the lead around your waist.
Please choose your size and hardware carefully as we make all Biothane products to order. We are happy to make modifications post-purchase but this may incur a small charge. Please see our policy here.
- Store:
- Delta Canine
- Price:
- $47.50