Power Y-Cable - Long Lead

 

This adapter plugs inline between the power supply and two cooling and/or ventilation units. The leads are approximately 24" in length. Ensure when powering multiple units that an appropriate power supply is used. Package also includes one 2.1mm x 5.5mm DC Plug (PA-PLG-21).

Store:
Techstyle
SKU:
CC-PA-YC-LL
Price:
$13.97
0 0
×