×
About this listing
Vendorama is an independent New Zealand shopping discovery platform.
We do not sell products ourselves.
Products on this page are sold by Amery Group on their own website.
Clicking "Visit Store" takes you directly to the retailer.
Own this business?
Claim your listing or request removal.
Amery Group 3 views Claim this Business♡
×-
$110Cooling Hoof BootsEspecially suitable for horses with laminitis.The cooling bell for the hoof is used for damaged or heavily used hooves as well as for lameness. The cool insert of the hoof bell cools from the edge of the crown to the supporting edge of the hoof.Additional Cooling Pads are available.Visit Store 0 0
-
$250Cooling Tendon BootsCooling the legs of the horse is especially important after a workout or after a long ride, because the temperature drop helps regenerate the tissue. In addition, cold therapy has an analgesic, anti-inflammatory effect reducing swelling. The cool boots can easily be used while in the box or during a...Visit Store 0 0
-
$370Sedelogic S Curve Saddle PadEspecially good for horses with sensitive backs or Kissing Spine.For the ultimate shock absorption, weight distribution and orthopaedic benefits, these uniquely re-mouldable custom fit saddle pads with a thin sturdy layer of breathable thermoplastic provide the perfect for for every horse. As your h...Visit Store 0 0
-
$270Sedelogic 2 ply padA lightweight English half pad suited for all disciplines, especially jumping, dressage and endurance. The Sedelogic pad is made of several layers of breathable 3D woven polyester fibre. Because of this open structure, the pad ventilates better and creates a better discharge of heat. This keeps your...Visit Store 0 0
-
$270Sedelogic Reverse Ortho PadSuited for training and competitive English-style riding, this reverse orthopaedic saddle pad is beneficial for all horses where the saddle needs a bit of a lift at the front, eg for croup high horses or under-developed muscles. This lightweight half pad can also be used when fitting a standard sadd...Visit Store 0 0
-
$270Sedelogic Ortho PadSuited for training and competitive English-style riding, this orthopedic saddle pad is beneficial for young and older horses with sensitive backs and poorly developed back muscles. The lightweight half pad can be used when fitting a standard saddle is difficult. It is pressure relieving, shock abso...Visit Store 0 0
×